Scripto | Revision Difference | Transcription

Wellington Coal Mine

GR-0431.2.6.12p010.jpg

Revision as of Mar 20, 2017, 1:23:27 AM
edited by 172.16.1.125
Revision as of Mar 20, 2017, 1:24:56 AM
edited by 172.16.1.125
Line 4: Line 4:
 
at Nottington this                                                     
 
at Nottington this                                                     
 
24th. day of April
 
24th. day of April
1879                                              Frank Little
+
1879                                              Frank Little (maybe a witness as writing is different)
 
           Norman R Spalding
 
           Norman R Spalding
 
                 foreman
 
                 foreman

Revision as of Mar 20, 2017, 1:24:56 AM

between 8 & 9 o'clock on Monday night, there was no reportof fire at that time. I have no memory of actions noted as Mr Spencer Simmons deputy to the general Management of the mine, I did not on this occasion interfere with .... who was in charge of the installation.

While Spencer Simmons was away at that time there was no certificated Manager at the mine. I did not see the level tried to see whether there was a gap.

Taken before me at Nottington this 24th. day of April 1879 Frank Little (maybe a witness as writing is different)

          Norman R Spalding
               foreman