Wellington Coal Mine

GR-0431.2.6.12p004.jpg

Revision as of Apr 20, 2020, 2:47:44 PM
edited by 172.16.1.125
Revision as of Nov 29, 2020, 3:07:03 PM
edited by 172.16.1.125
Line 1: Line 1:
 
(no. 2)      5
 
(no. 2)      5
  
And by opening another Curtain on no. 10 level outside of Homes heading, and also by pulling up a Curtain (no. 3.) across No. 10 level inside Home's [?] heading.  When the fire was discovered my father was sent for & arrived at the Mine at about 1/2 past 3 o'Clock on the morning of Wednesday the 10th inst.  I was with my father & we immediately went down the mine & into Homes heading where the fire was, then my father took the management of the mine.  The pump was connected to the Hose and water pumped on the fire.  the pump was got ready about 2 P.M. & previous to this a Curtain No. 3 was put across No. 10 level.  No. 2. & No. 1. Curtain were lifted for the purpose of getting the full force of air up to the fire in Homes heading.  We did not allow the full force of air to go on to the fire until we got the pump ready, we then lifted a Curtain No. 4 so as to prevent the air going on to the fire until the pump was ready still continuing to keep another Curtain No. 5 shut accross the head of Homes heading for the purpose of Confining the fire until we were ready with the water.
+
And by opening another Curtain  
 +
on no. 10 level outside of Homes  
 +
heading, and also by pulling up  
 +
a Curtain (no. 3.) across No. 10 level
 +
inside Homes' heading.  When  
 +
the fire was discovered my father  
 +
was sent for & arrived at the Mine  
 +
at about 1/2 past 3 o'Clock on the  
 +
morning of Wednesday the 10th inst.   
 +
I was with my father & we immediately  
 +
went down the mine & into Homes  
 +
heading where the fire was, then  
 +
my father took the management  
 +
of the mine.  The pump was con-
 +
nected to the Hose and water  
 +
pumped on the fire.  the pump  
 +
was got ready about 2 P.M. &  
 +
previous to this a Curtain No. 3  
 +
was put across No. 10 level.  No.  
 +
2. & No. 1. Curtain were lifted for  
 +
the purpose of getting the full force  
 +
of air up to the fire in Homes heading.   
 +
We did not allow the full force of  
 +
air to go on to the fire until we  
 +
got the pump ready, we then lifted  
 +
a Curtain No. 4 so as to prevent the air go-
 +
ing on to the fire until the pump  
 +
was ready still continuing to keep  
 +
another Curtain No. 5 shut ac-
 +
cross the head of Homes heading  
 +
for the purpose of Confining the fire  
 +
until we were ready with the water.
 +
 
 +
BC Archives  GR-0431  British Columbia, Attorney General/ Box 2 File 6/ Inquisitions-inquests conducted by coroners in British Columbia.

Revision as of Nov 29, 2020, 3:07:03 PM

(no. 2) 5

And by opening another Curtain on no. 10 level outside of Homes heading, and also by pulling up a Curtain (no. 3.) across No. 10 level inside Homes' heading. When the fire was discovered my father was sent for & arrived at the Mine at about 1/2 past 3 o'Clock on the morning of Wednesday the 10th inst. I was with my father & we immediately went down the mine & into Homes heading where the fire was, then my father took the management of the mine. The pump was con- nected to the Hose and water pumped on the fire. the pump was got ready about 2 P.M. & previous to this a Curtain No. 3 was put across No. 10 level. No. 2. & No. 1. Curtain were lifted for the purpose of getting the full force of air up to the fire in Homes heading. We did not allow the full force of air to go on to the fire until we got the pump ready, we then lifted a Curtain No. 4 so as to prevent the air go- ing on to the fire until the pump was ready still continuing to keep another Curtain No. 5 shut ac- cross the head of Homes heading for the purpose of Confining the fire until we were ready with the water.

BC Archives GR-0431 British Columbia, Attorney General/ Box 2 File 6/ Inquisitions-inquests conducted by coroners in British Columbia.